Free document template
A roofing estimate that explains the roof assembly
A roof replacement price needs more context than the shingle color. Roof geometry, existing layers, decking condition, penetrations and access affect the work. This sample separates tear-off, the specified covering system and flashing details. It asks for a measured roof sketch and a plan for discoveries under the existing covering, with gutters, skylights and interior damage kept distinct from the base roof scope.
Example document · illustrative amounts
Example: Roofing Estimate
Reference: [Project reference and estimate revision]
From
[Business name, address and estimator contact]
To
[Client billing details and project location or brief]
| Description | Quantity / unit | Rate | Amount |
|---|---|---|---|
| Remove surveyed roof covering and handle agreed debris | 18 roofing squares | $78.00 | $1,404.00 |
| Supply and install specified shingle roof system | 18 roofing squares | $215.00 | $3,870.00 |
| Renew listed flashing details at surveyed penetrations | 1 flashing scope | $390.00 | $390.00 |
Total (USD): $5,664.00
Example: this invented roof and its quantities and prices are instructional only, not roofing rate guidance.
[Attach measured elevations or roof sketch, slope notes and the material specification.]
[Define the unit used, included layers and waste assumptions.]
[Explain how damaged decking will be documented and separately discussed.]
[List flashing, ventilation, gutters and skylights as included, excluded or separate options.]
How to use the template.
- Measure the roof and inspect accessible details using appropriate professional procedures. Record the limits of the assessment.
- Specify the covering system and components, rather than relying on a product color alone.
- Describe tear-off layers, debris handling and protection of the property below. Note staging and delivery access.
- Set out decking assumptions and the process for assessing concealed damage. Keep uncertain repairs distinguishable from measured replacement work.
- Review penetrations, transitions and ventilation details against the drawing before issuing the estimate.
Useful answers.
What does a roofing square mean in the sample?
It is an area unit used in roofing. Define your measurement convention on the estimate and show how the measured roof area, material quantities and waste allowance relate.
Should decking replacement be included automatically?
Describe what inspection established and what remains concealed. If decking work is uncertain, state the assumption and how discovered damage will be assessed and priced for discussion.
Can I adapt this to metal roofing?
Yes, but replace the shingle system with the selected panel profile, finish, fastening and flashing scope. Review handling, roof details and installation assumptions rather than changing only the material name.
Keep exploring.
Software for small business
Take the next document into your working day.
Create estimates and invoices, share PDFs through your device, and record payments received elsewhere. Start your 14-day free trial. No card needed.
Compare plans in USD